Pressmeddelande

Metacon publishes annual report for 2025

Metacon AB (publ) has today published its annual report and consolidated accounts with auditor’s report for the financial year 2025. The annual report is available on Metacon’s website, www.metacon.com/financial-reports/.

For further information, please contact:
Christer Wikner, on 0707–647389 or Mattias Jansson, on 0722-316862
e-mail:
[email protected].

About Metacon AB (publ)
Metacon AB (publ) is a Swedish developer, manufacturer, and supplier of hydrogen production systems, covering design, installation, service, and maintenance. The company is listed and traded on Nasdaq First North Growth Market in Stockholm, Sweden. 

Metacon’s Electrolysis business unit designs and delivers complete electrolysis plants for large-scale hydrogen production, developed in close partnership with one of the global leaders in pressurized alkaline electrolysis technology - PERIC Hydrogen Technologies in Handan, China.

Metacon’s Reforming business unit develops hydrogen generation solutions based on its patented HIWAR® catalytic reactor technology. These solutions consist of advanced, high-efficiency reformers that produce hydrogen through catalytic steam reforming, operating on biogas, biomethane, or other renewable feedstocks such as bioethanol and green ammonia, without the need for grid connection.

For further information please see:
www.metacon.com | X: @Metaconab | LinkedIn: www.linkedin.com/company/metaconab

Bifogade filer